top of page
Metering
Overhead/Underground Line
The point of interconnection is usually after the meter socket for single-phase services.
Cooperative's Responsibility
Member's Responsibility
-
Line outages (caused by lightning, storms, ice, trees, wind, broken wires, broken poles, broken insulators, animals, faulty primary underground).
-
Primary fuses on transformers or line tops.
-
Failed transformers.
-
Substation outages.
-
Tripped breaker or blown fuses below the meter or in any building.
-
Bad connection on entrance to buildings or house.
-
Wrapped or broken wires on the member-owner's side of the meter pole.
-
Tree or tree branches in wires on member-owner's side of the meter pol.
Note: Iowa law requires that you call IOWA ONE CALL forty-eight hours prior to excavating. Any time you plan to excavate, whether it is a small or large construction project, call 811 or 1-800-292-8989.
bottom of page